Week of 16.03.2026 ================== **Miscellaneous** - Loïc + Johnan ordered Test Setup parts + USB Mic + Containers + Locks. [arrived] - Missing Gantry Plates for the test setup - Motors Arrived! - Wires and connectors have arrived - More connectors + Matek Buck + Flux + Soldering iron + Emergency stop have been ordered **Team Software** - Got CAN working with 2 adapters - Liam figured out we need to buy credits for Pupper - Figured out how to make a motor spin **Team Elect** - Requirements for PDBueno have been defined - Maxime added the footprints to the parts - Johnan will do the routing - We will need a CAN board - CAN section was integrated in PDBueno - PDBueno ordered - Created cables to interface with PDBueno **Team Mecha** - Killian and Christy mainly finished the design of the test setup - Killian will work on a version of the leg - Killian did BOM for test setup - Test setup was redesigned - FIrst protype of the leg was created wit 2 DOF - Christy made first box for PDBueno