Week of 16.03.2026
Miscellaneous
Loïc + Johnan ordered Test Setup parts + USB Mic + Containers + Locks. [arrived]
Missing Gantry Plates for the test setup
Motors Arrived!
Wires and connectors have arrived
More connectors + Matek Buck + Flux + Soldering iron + Emergency stop have been ordered
Team Software
Got CAN working with 2 adapters
Liam figured out we need to buy credits for Pupper
Figured out how to make a motor spin
Team Elect
Requirements for PDBueno have been defined
Maxime added the footprints to the parts
Johnan will do the routing
We will need a CAN board
CAN section was integrated in PDBueno
PDBueno ordered
Created cables to interface with PDBueno
Team Mecha
Killian and Christy mainly finished the design of the test setup
Killian will work on a version of the leg
Killian did BOM for test setup
Test setup was redesigned
FIrst protype of the leg was created wit 2 DOF
Christy made first box for PDBueno