Week of 16.03.2026

Miscellaneous

  • Loïc + Johnan ordered Test Setup parts + USB Mic + Containers + Locks. [arrived]

  • Missing Gantry Plates for the test setup

  • Motors Arrived!

  • Wires and connectors have arrived

  • More connectors + Matek Buck + Flux + Soldering iron + Emergency stop have been ordered

Team Software

  • Got CAN working with 2 adapters

  • Liam figured out we need to buy credits for Pupper

  • Figured out how to make a motor spin

Team Elect

  • Requirements for PDBueno have been defined

  • Maxime added the footprints to the parts

  • Johnan will do the routing

  • We will need a CAN board

  • CAN section was integrated in PDBueno

  • PDBueno ordered

  • Created cables to interface with PDBueno

Team Mecha

  • Killian and Christy mainly finished the design of the test setup

  • Killian will work on a version of the leg

  • Killian did BOM for test setup

  • Test setup was redesigned

  • FIrst protype of the leg was created wit 2 DOF

  • Christy made first box for PDBueno